西北电网750kV示范工程零起升流、升压试验研究  被引量:1

Study on Zero-initial Current and Voltage Boosting Experiments in 750 kV Demonstration Project of Northwest Grid

在线阅读下载全文

作  者:焦莉 王新[2] 彭书涛[2] 张小庆[2] 

机构地区:[1]陕西省电力公司,陕西西安710004 [2]陕西电力科学研究院,陕西西安710054

出  处:《陕西电力》2007年第1期15-20,共6页Shanxi Electric Power

摘  要:从西北电网750 kV示范工程试验系统入手,认真分析、研究、计算、校核了750 kV系统零起升流、升压试验时是否会发生自励磁现象、试验系统各变压器分接头位置能否满足各级电压运行的要求,提出零起升流、升压试验方案。针对试验方案,做出相应的事故预想,最后给出试验结果。Based on the experimental system of 750kV demonstration project in northwest power grid of China, the self-excitation phenomenon at starting procedure and the location of transformer taps are studied. The selection of transformer taps must meet the need of different voltage levels. According to the study, the experiment schemes of voltage and current rising from zero are proposed. The accident prospecting is put forward on the experiment schemes. The experiment results are also presented.

关 键 词:750 KV示范工程 试验系统 电气计算 试验方案 事故预想 零起升流 升压 试验结果 

分 类 号:TM744[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象