检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘树红[1] 杨魏[1] 吴玉林[1] 单庆臣[2] 周大庆[1] 张梁[1]
机构地区:[1]水沙科学与水利水电国家重点实验室清华大学,北京100084 [2]天津市天发重型水电设备制造有限公司,天津300400
出 处:《水力发电学报》2007年第1期110-113,118,共5页Journal of Hydroelectric Engineering
基 金:国家自然科学基金资助(10532010)
摘 要:本文完成了福建大干水电站贯流式水轮机转轮的改型设计,同时完成了水轮机原型改型前后的全流道三维定常湍流计算,验证了改型设计的可行性。通过计算获得了各过流部件的流动细节,预估了水轮机的性能,与模型试验结果进行了比较,并从提高流量的角度对水轮机进行了改进,提高了机组的出力。The runner of the tubular turbine of FuJian DaGan water power station is modified. In the meanwhile, 3-D steady turbulent flow is calculated through the whole flow passage of the turbine before and after modification,which validates the feasibility of the plan. The detail of flow through the whole flow passage is attained, the energy property of the turbine is predicted and compared with the experimental result. And amelioration of the turbine is taken from the point of increasing the discharge, which increases the output of the power station.
分 类 号:TK733.8[交通运输工程—轮机工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30