检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长安大学桥梁与隧道陕西省重点实验室,陕西西安710064
出 处:《长安大学学报(自然科学版)》2007年第1期40-44,共5页Journal of Chang’an University(Natural Science Edition)
基 金:云南省交通科技项目(TST2002204A)
摘 要:针对索鞍无预偏施工悬索桥的几何形状对温度变化非常敏感等特点,研究了主缆架设过程中存在的温度效应问题。建立了主缆架设中索股、主缆横断面和纵断面的温度模型,根据无应力索索长恒定不变的原理求解温度作用下主缆中、边跨垂度,得出了垂度计算公式,给出了有关主缆索股调整的具体方法。结果表明,该温度模型和计算公式是准确调整索股垂度的一种较简便可行的方法,为索鞍无预偏施工悬索桥的设计与施工提供了一定的理论依据。The geometry of the suspension bridge built by the non-pre-bias of cable-saddle is very sensitive to the temperature in the process of the main cable's erection. The temperature models of the cable, the main cable's cross-section and vertical section are developed during the main cable erection. According to the cable length constant and changelessness principle of unstressed cable, the main cable sags of mid-span and side-span are calculated under temperature action, the calculation formulas of the sags are given, the method of main cable adjustment is put forword. The result shows that the temperature model and the calculation formulas are feasible and accurate to make an cable sags adjustment. They can offer the theory basis for the design and construction of the suspension bridge built by the non-pre-bias of cable-saddle. 1 tab, 4 figs, 11 refs.
关 键 词:桥梁工程 悬索桥 索鞍无预偏 温度分布 温度模型 垂度调整
分 类 号:U448.25[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222