检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,湖北武汉430072 [2]华北电力大学,北京102206
出 处:《广西水利水电》2007年第1期1-4,共4页Guangxi Water Resources & Hydropower Engineering
基 金:国家自然科学基金项目资助(50579019)
摘 要:大广坝流域洪水由台风雨形成,台风登陆路径的不同造成台风期降雨中心位置分布的差异,另外流域上游的友谊水库对下游大广坝水库天然入流方式的改变,直接导致洪水预报方案的改变,即从全流域产汇流计算改为“上下库区间汇流计算和库区产汇流计算”。通过分析大广坝流域台风雨洪成因及其特点,按降雨类型分别设计了相应的洪水预报方案,经检验,方案预报精度达到甲等水平,可为大广坝电站防洪度汛提供更加准确及时的雨洪信息。Flood in Daguangba river basin is caused by typhoon rain. The different landing mutes of typhoon result in different sites of rainfall centers during typhoon period. Additionally, the upstream Youyi reservoir has changed the natural inflow course of downstream Daguangba reservoir, which directly leads to the change of flood forecasting mode from runoff yield and conflux of the entire valley to an inter-zone conflux plus runoff yield and conflux of the reservoir area. Based on an analysis of the origin and feature of typhoon rain flood in Daguangba basin, corresponding flood forecasting schemes are designed for different types of rainfall. The resuits of test demonstrate that the forecasting scheme, with a precision up to grade A level, will be able to timely offer more exact rainstorm flood information for flood prevention of Daguangha Hydropower Station.
关 键 词:洪水预报 暴雨洪水 台风雨 水情测报系统 大广坝
分 类 号:P338[天文地球—水文科学] TV122[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15