检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄永健[1] 丁留谦[1] 赵进勇[1] 何秉顺[1]
出 处:《水利水电技术》2007年第2期70-73,共4页Water Resources and Hydropower Engineering
基 金:科技部农业科技成果转化资金项目(04EFN216800344)
摘 要:如何在岸滩上建筑排体的锚固结构,是河口排体护岸工程的技术关键。由T型锚桩、枯水平台为主要构件的新型锚固结构,是将固排力分散到各个锚桩上,使排体能在淤泥软基上满足稳定条件。由于各主要构件都进行预制,只需到现场拼装焊接并浇筑少量的混凝土,缩短了现场的施工时间,提高了工效。The anchorage of geomattress in riverbank is one of the key techniques for the application of geomattress in riverbank protection projects. A new type of anchorage structure is introduced that includes T-type anchor pile and the low flow platforms. The structure can distribute loads to different anchor piles. As a result, the whole system can satisfy stability requirements on soft foundations. All the main components are prefabricated and only a few amounts of concrete need to be poured in-situ. In this way, construction efficiency can be improved and construction periods can be shorten.
分 类 号:TV856[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195