检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]东北大学采矿系,辽宁沈阳110004 [2]北洺河铁矿,河北武安市056300
出 处:《矿业研究与开发》2007年第1期17-19,共3页Mining Research and Development
摘 要:无底柱分段崩落法按分段连续回采,当回采面积足够大时,完全可以利用第一分段的连续采空区诱导上部矿岩安全冒落。北洺河铁矿应用这一技术形成诱导冒落与强制崩落相结合的无底柱高效采矿工艺,创造了投产19个月达产的国内最好纪录。In sublevel caving mining without sill pillar, the mining progresses continuously by sublevels. Therefore, when the area of exposed roof is sufficiently large at the first sublevel in sublevel caving, the ore in upper sublevels can be induced to cave in a safe way making use of the mined - out area at first sublevel. The application of this induced caving technique has formed a high - efficiency non - sublevel pillar mining technique based on the combination of induced caving and forced caving in the Beiminghe Iron Mine, and results in a China's short - time record that the deigned production capacity of the mine was reached after going into production for one year and seven months.
分 类 号:TD861.1[矿业工程—金属矿开采] TD853.36[矿业工程—矿山开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15