天荒坪抽水蓄能电站岔管区域高压渗透试验  被引量:10

High Pressure Permeability Test at Tianhuangping Pumped Storage Power Station

在线阅读下载全文

作  者:刘世明[1] 胡宏磊 陈鼎[1] 

机构地区:[1]华东勘测设计研究院

出  处:《岩土工程学报》1996年第6期31-38,共8页Chinese Journal of Geotechnical Engineering

摘  要:天荒坪高压渗透试验旨在揭示高压岔管所在岩体在高内水压力作用下的稳定和渗透性,以论证可否建造高压钢筋混凝土岔管,并为设计提供允许水力坡降、渗水量、地应力参数及为工程措施提供依据。3只试验孔的试验结果表明,岔管区域总体上环境地应力足够高,但是,2#岔管附近存在地应力低、渗水量大的局部岩体。High pressure permeability test in a drillhole at Tianhuangping was carried out as feasibility studies for manifolds with no steel lining. The maximum testing pressure was 10MPa. Test results show that the average initial stresses in the rock are great enough to build a manifold with no steel linig. But in some places, the stresses are not great enough and the leakage through the surrounding rock mass is rather great. So proper measures should be taken to improve the situation.

关 键 词:高压渗透 钢筋混凝土岔管 抽水蓄能电站 岔管 

分 类 号:TV743[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象