检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华东电力试验研究院,上海市虹口区200437 [2]华东电网有限公司,上海市黄浦区200002
出 处:《电网技术》2007年第5期58-63,共6页Power System Technology
摘 要:利用2004年4月8日黄渡站5101线人工单相接地短路故障试验的系统数据,特别是试验时测录的相量测量数据,在华东电网发电机和励磁系统建模及参数实测工作取得成果的基础上,进行了试验方式下的潮流、短路电流和暂态稳定仿真计算,并与实测数据相比较。通过分析发电机、励磁系统、电力系统稳定器、负荷等模型和参数对仿真结果的影响,探索了利用相量测量数据进行电网计算用模型参数校核的方法和思路。By use of the data measured in the testing of man-made single-phase earth fault performed on April 8th, 2004 at transmission line No. 5101 near Huangdu substation, especially the measured phasor data during the testing, and according to the obtained achievements in the modeling and parameter measurement of generators and excitation systems of East China Power Grid, the simulation of power flow, short circuit current and transient stability are conducted under the same condition as used in the performed testing, and the simulation results are compared with the measured data. By means of analyzing the impacts of the models and model parameters of generator, excitation system, power system stabilizer (PSS) and loads on simulation results, the approach and thinking of adopting measured phasor data to verify the model parameters for power grid calculation are researched.
关 键 词:发电机 励磁系统 相量测量单元 负荷模型 参数校核 电力系统
分 类 号:TM74[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229