检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国建筑科学研究院工程抗震研究所,北京100013 [2]北京肿瘤医院,北京100035
出 处:《建筑科学》2007年第3期71-76,共6页Building Science
摘 要:该房屋为办公性质综合楼,框架-抗震墙结构。对该房屋进行加建二层的改造,原有部分进行相应的结构加固;同时在房屋东北侧贴建七层过街楼;另在正东侧设置地下一层、地上一层的设备电气间及门厅,与原有部分连为整体。房屋原有结构施工质量较差,原设计存在一定问题。改扩建后的综合楼使用功能复杂,内部设备多,结构体系复杂。设备、电气系统要求多样化且有专用医院试验系统。工程难度很大。Structural system of main building is RC Frame-Shearwall. The expanding construction includes 2-story adding, structural reinforcement of former part, and a 7-story arcade newly built NE to the main building. Additional electric and facility room, and entrance hall with one story under and over ground east to the main building, would be added to connect the former main building with the newly added expansion. As for the existing inaccuracy of former construction quality and design, and more complicated function needs, with various facilities equipped, these result in rather complicated structural system. Further more, the diverse requirement of facility and electric system and the professional hospital test system add difficulties to appraisal and design for expanding.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.94.214