蒲石河抽水蓄能电站钢筋混凝土岔管有限元计算  

Finite element calculation of reinforced concrete breeches pipe in Pushihe pum ped-storage power station

在线阅读下载全文

作  者:邓柏旺[1] 袁晓宇[2] 

机构地区:[1]河海大学水电院,江苏南京210098 [2]上海市水利建设工程质量监督中心站,上海200232

出  处:《东北水利水电》2007年第3期3-6,共4页Water Resources & Hydropower of Northeast China

摘  要:结合蒲石河抽水蓄能电站地下引水高压钢筋混凝土岔管实例,利用弹簧简化模型,应用三维有限元非线性计算方法,分析研究了地下钢筋混凝土岔管在充水运行与放空检修工况下,衬砌、钢筋的应力与变形。通过分析计算结果得出衬砌厚度的合理取值,并对衬砌的配筋及最大裂缝宽度进行探讨。Taking reinforced concrete breeches under high pressure in Pushihe pumped storage power station as the example the paper analyses the stress and the deformation of lining and reinforcing bar with three-dimensional non-linear finite element method and simplified spring model under the condition of charging and emptying reinforced concrete breeches pipe,obtains the radonal value of lining thickness and discusses the reinforcement of lining and the width of maximumfissure.

关 键 词:钢筋混凝土 有限元 岔管 蒲石河抽水蓄能电站 

分 类 号:TV554.14[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象