检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:涂扬举[1] 马光文[1] 陶春华[1] 过夏明[1] 唐明[1]
机构地区:[1]四川大学水电学院
出 处:《水力发电》2007年第1期26-28,共3页Water Power
基 金:国家自然科学基金重点资助项目(50539140)
摘 要:为实现水电站施工资源优化配置,提高水电站建设的经济效益,提出了堆石坝施工优化模型,模型中考虑了日上升高程约束和相邻区的高差约束,并用加速遗传算法实现了优化计算。对国内某一在建堆石坝的计算结果表明,该方法是可行的,对大坝建设期间的资源配置和强度计划制定有一定指导意义。This paper presents the construction optimization model of rockfill darn, in order to optimize the construction resource configuration and increase the economic benefit of hydropower station construction. In the model, some constraints, such as the maximum raising height of a day and the difference between neighboring parts, are taken into account, What's more, the accelerating genetic algorithm (AGA) is used for the problem. A calculating example iS given, and the showed the methd is feasible and useful for dispatching resource and establishing intensity plan during the construction of dam.
分 类 号:TV511[水利工程—水利水电工程] TV641
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3