检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]新疆农业大学水利与土木工程学院,新疆乌鲁木齐830052 [2]内蒙古水文总局,内蒙古呼和浩特010010
出 处:《水力发电》2007年第1期34-36,共3页Water Power
基 金:新疆水利水电工程重点学科基金资助项目(xjzdxk-2002-10-05);新疆高校科研计划重点资助项目(xjedu2005i09)
摘 要:采用边界元法研究无限深透水地基上土石坝铺盖长度对坝基渗流的影响。土石坝坝基渗流量随铺盖的延长逐渐减小,并呈抛物线形分布;当铺盖长度达到一定值时,水力坡降稳定且渗流量的变化也不明显。由此,提出了建在无限深透水地基上的土石坝水平铺盖长度与坝前水头的关系。This paper introduces the boundary element method to study the affect of the blanket length for earth-rock dam on the infinite deep pervious foundation on the seepage of dam foundation. The seepage discharge of the foundation of earth-rock dam decreases gradually and is in a parabola form as the blanket extends. If the blanket length reaches certain value, its hydraulic gradient is steady and the variety of seepage discharge also not obvious. This paper puts forward the relation of water head and blanket length of earth-rock dam on the infimte deep pervious foundation.
分 类 号:TV698.12[水利工程—水利水电工程] TV641
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222