天荒坪抽水蓄能电站上水库沥青混凝土护面设计及裂缝处理  被引量:3

Design and Treatment on Asphaltic Concrete Facing of Upper Reservoir in Tianhuangping Pumped Storage Power Station

在线阅读下载全文

作  者:张春生[1] 张克钊[1] 

机构地区:[1]中国水电顾问集团华东勘测设计研究院,浙江杭州310014

出  处:《水力发电》2007年第1期37-39,共3页Water Power

摘  要:天荒坪抽水蓄能电站上水库工程地质条件复杂,除东库岸进水口范围采用喷混凝土、混凝土衬砌外,主副坝上游坡面及其余库岸和库底均采用简式沥青混凝土护面防渗。上水库运行初期共产生了34条裂缝,经修补处理后,从2001年5月运行至今,库底渗水量未见异常增大。由于沥青混凝土可快速修补,修补后没有龄期要求即可蓄水,因此采用沥青混凝土护面具有一定的优越性。The engineering geological conditions of the upper reservoir in Tianhuangping Pumped Storage Power Station are very complex. The simple asphalt concrete facing is adopted for whole reservoir bottom except the inlet and outlet area. There Were 34 cracks on the asphalt concrete impervious face slab during the early operation period. After repairing, the seepage has not increased since May of 2001. Because the asphalt conerete eanbe repaired quickly and it can impeund water immediately after repairing,the adoption of asphalt concrete facing has certain advantage.

关 键 词:沥青混凝土防渗护面 裂缝处理 上水库 天荒坪抽水蓄能电站 

分 类 号:TV698.231[水利工程—水利水电工程] TV544.924

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象