小浪底水库运用后山东黄河防凌问题分析  

Issues related to ice jam control of Yellow River after operation of Xiaolangdi Reservoir

在线阅读下载全文

作  者:戴明谦 赵文明 宋淑平[3] 梁建锋[1] 

机构地区:[1]山东黄河河务局,济南250011 [2]山东黄河工程局,济南250013 [3]山东聊城黄河河务局,聊城252052

出  处:《中国水利》2007年第3期40-42,共3页China Water Resources

摘  要:黄河小浪底水库运用后,可有效控制黄河下游河道流量,基本解决了山东黄河的防凌问题。但受小流量封河、跨流域调水和突发事件等因素的影响,山东黄河防凌又出现了新的问题。2001年小浪底水库投入防洪调度运行以来,对黄河山东段的河道变化情况及气温、水情、凌情等因素进行了分析,提出了做好防凌工作的建议。After the operation of Xiaolangdi Reservoir, fiver flow in the down stream of the Yellow River is effectively controlled, which ice jam in the Shandong section of the Yellow River is mostly prevented. However, new problems with ice jam control in the Shandong section comes out because of fiver frozen due to small flows, across-basin water diversion and occurring of emergencies. On the basis of analysis of changes of fiver course conditions, temperature, water and ice-jam conditions in the Shandong section after the operation of Xiaolangdi Reservoir in 2001, suggestions for bettering work of ice jam control is proposed.

关 键 词:防凌 黄河山东段 小浪底水库 

分 类 号:TV875[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象