浅谈弹簧隔振基础施工技术在六安电厂工程中的应用  被引量:1

Foundation construction technology using spring sets to isolation the vibration of coal breaker

在线阅读下载全文

作  者:王林伟[1] 

机构地区:[1]安徽电力建设第一工程公司,安徽合肥230088

出  处:《安徽电力》2007年第1期49-51,共3页Anhui Electric Power

摘  要:文中主要围绕六安电厂工程中粗、细碎煤机弹簧隔振设备基础的施工过程,介绍了弹簧隔振基础施工程序、模板支撑系统、弹簧隔振器安装固定、台板钢筋安装和混凝土浇筑等工序中采取的措施,为类似弹簧隔振基础施工提供经验和依据。On the base of construction process of foundation for coarse and fine coal breaker by spring sets to isolate of foundation construct. Vibration in Lu'an Power plant project, this paper introduced the procedures by spring by spring sets to isolate vibration and template bracing system. Also, it showed the engineering methods on fixation and installation of spring sets isolation equipment, bedplate reinforcing steel bars installation and concrete casting. It can provide projects foundation construction by spring sets to isolate the vibration with engineering experiences and bases.

关 键 词:发电厂 弹簧隔振 施工技术 模板支撑系统 混凝土 

分 类 号:TM621[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象