检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宋卫东[1] 王永清[1] 马鹏姣[1] 杜建华[1] 张继清[2]
机构地区:[1]北京科技大学金属矿山高效开采与安全教育部重点实验室,北京100083 [2]铁道第三勘察设计院,天津300142
出 处:《北京科技大学学报》2007年第3期251-255,共5页Journal of University of Science and Technology Beijing
基 金:教育部新世纪优秀人才支持计划资助项目(No.NCET-04-0102)
摘 要:以北京地铁五号线近接玉蜓桥施工为工程背景,运用三维有限元程序ANSYS对地铁区间隧道的开挖过程进行模拟,分析隧道开挖对玉蜓桥桥台及地面环境的影响,并将计算结果与实测结果进行对比分析.结果表明,按照设计要求施工,地铁五号线近接玉蜓桥施工时,对地面环境和桥台的影响均可控制在设计允许的范围之内,无需采取额外的预加固措施.The excavation process of the tunnel construction in metro line No. 5 adjacent to Yuting Bridge in Beijing was modeled by 3D-ANSYS numerical code. The influence of the excavation on the bridge's platform and ground environment was analyzed. The computed results were compared with measured data. It is shown that the influence of the excavation on the bridge's platform andground environment is in the range of the allowable value following the design. Any additional prior consolidating measure is not needed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43