检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:唐捷[1] 任震[1] 高志华[1] 陈亮[2] 刘奇[2]
机构地区:[1]华南理工大学电力学院,广东省广州市510640 [2]广东省电力调度中心,广东省广州市510600
出 处:《电网技术》2007年第6期61-66,共6页Power System Technology
基 金:广东省自然科学基金资助项目(000397)
摘 要:针对“厂网分开”后我国电力市场的现状分析了与峰谷分时电价相关的各方成本和效益,分别建立了电网公司、电力用户、发电公司和全社会的成本效益分析模型,并详细介绍了成本效益分析的计算流程。算例分析结果表明利用所提出的成本效益分析模型可得出确保各参与方的益本比均大于或等于1的“削峰填谷”电量临界值。研究成果可为各参与方分析峰谷分时电价方案的可行性提供参考。Considering the actuality of electricity markets in China after the division of proprietorships of power plants and power grids, the cost and benefit of each participant are analyzed one by one and the cost-benefit analysis models of power grid companies, power customers, generation companies and entire society are proposed respectively. The calculation flow of cost-benefit analysis is also presented in detail. Numerical analysis results show that the proposed cost-benefit analysis models can be used to calculate the critical power quantity of peak load leveling which can ensure that the benefit cost ratio (BCR) of each participant is more than or equal to 1. The achievements of this research can be available for reference to the participants of electricity markets in the analysis on the feasibility of the peak-valley TOU electricity price projects.
关 键 词:需求侧管理(DSM) 峰谷分时电价 成本效益分析 益本比 削峰填谷
分 类 号:TM73[电气工程—电力系统及自动化] F123.9[经济管理—世界经济]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.177