检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中石化南方勘探开发分公司研究院
出 处:《钻采工艺》2007年第2期77-78,共2页Drilling & Production Technology
摘 要:百色油田注水开发中由于强采强注和压裂等措施导致了大孔道的产生,加剧了油层非均质性,使注入水沿大孔道向油井窜进严重,造成大部分注水井无效注水,水驱波及系数降低。为有效堵住大孔道,提高水驱效率,立足于地层大孔道中注入水平面径向流形成压降漏斗的原理,开展了大孔道高渗透地层封堵技术方法研究,从而确定了压降漏斗法封堵大孔道技术,改善了注水状况,取得了较好的降水增油效果。During the waterflood development of Baise Oil Field,the adoption of fracturing and forced recovery and injection bring about large pore passages and aggravate the heterogeneity of oil reservoirs. The injected water flow along the large pore passages into oil wells, therefore, the water injection of many wells are unfruitfulness and the water-driving sweep efficiency are low. In order to effectively plug large pore passages,the plugging technique of high permeability zone with large pore passage was researched on the basis of plane radial flow principle of injecting water in strata with large pore passage. In practice,this technique,been called as Pressure Drop Funnel Plugging Large Pore Passage,can easily solve the technique problem of severe water breakthrough in oil reservoirs and improve injection condition,the production rate was increased.
分 类 号:TE357.6[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30