检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Wang Nan Bai Jianhua Li You Gu Xiaoguang Li Chunshan Wang Ben
机构地区:[1]State Power Economic Research Institute [2]Northeast China Grid Company Limited [3]不详
出 处:《Electricity》2007年第1期39-42,共4页电气(英文版)
摘 要:Peak regulation in the Northeast power grid is going from bad to worse. This stimulates the need to pumped-storage hydropower for its role in this respect. Based on the status of power sources and the load forecast in the system, the author puts forward a minimum construction scale of pumped-storage stations by the end of 2020 from technical feasibility, and an economic scale from economy. The analysis and comparison on the two schemes can be regarded as a reference for reasonably planning pumped-storage stations in the northeastern part of China.Peak regulation in the Northeast power grid is going from bad to worse. This sttmulates the need to pumped-storage hydropower for its role in this respect. Based on the status of power sources and the load forecast in the system, the author puts forward a minimum construction scale of pumped-storage stations by the end of 2020 from technical feasibility, and an economic scale from economy. The analysis and comparison on the two schemes can be regarded as a reference for reasonably planning pumped-storage stations in the northeastern part of China.
关 键 词:东北电网 抽水蓄能水电站 调峰 建设规模 经济规模 技术可行性
分 类 号:TM731[电气工程—电力系统及自动化] TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.148