我国无底柱分段崩落法的发展方向  被引量:13

The No-pillar Development Direction in China

在线阅读下载全文

作  者:孙光华[1] 吕广忠[1] 

机构地区:[1]河北理工大学资源与环境学院,河北唐山063009

出  处:《河北理工学院学报》2007年第2期4-6,共3页Journal of Hebei Institute of Technology

摘  要:我国无底柱矿山长期以来,基本上采用10m×10m(分段高度×进路间距)左右的小结构参数,限制了无底柱采矿法优越性的发挥,大间距结构参数较小结构参数而言,对增大开采强度,减少采准工程量,降低采矿成本等均具有明显的效果。大间距无底柱采矿工艺更加适合我国当前的生产力发展水平,便于应用和推广。For a long time,the small structure parameter that was 10m × 10m was abopted by non-pillar mine in our country, which restricted the advantage of non-pillar to develop. By comparing with the small structure parameter, the large space parameter is super in some aspects, such as improving mining intention, and reducing preparatory work, and reducing mining cost, which is the current productivity of our country and is easy for application. It is the first structure parameter of non-pillar in our country.

关 键 词:无底柱分段崩落法 大间距 高分段 

分 类 号:TD801[矿业工程—矿山开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象