6~10kV配电网微机型电容电流测试仪的研制  被引量:10

Measurement System of Capacitive Current for 6 -10 kV Distribution Network Based on Microcomputer

在线阅读下载全文

作  者:李晓波[1] 刘建华[1] 牟龙华[2] 王崇林[1] 张军国[3] 

机构地区:[1]中国矿业大学信息与电气工程学院,徐州221008 [2]同济大学电子与信息工程学院,上海200092 [3]北京林业大学工学院,北京100083

出  处:《高电压技术》2007年第3期99-103,共5页High Voltage Engineering

摘  要:随着电力系统的发展、配电事故的增多、电容电流的增大,有必要研究微机化、智能型的配电网电容电流测试系统。通过对各种电容电流测试方法的研究,提出了单相经电阻接地的测试方法并设计出了6~10kV配电网使用的微机型电容电流测试仪。该测试仪基于对称分量法的原理,通过测量电网单相经电阻接地时的二次零序电压UR02、流过接地电阻的电流IRE及电网单相直接接地时的二次零序电压即TV二次线电压U02,能够间接得到电网单相直接接地时的接地电流。根据所测的IR∑和UR02的相位关系,能够进一步得知电网的电容电流Ic∑和电网对地绝缘电阻电流IR∑的大小及中性点经消弧线圈接地电网中消弧线圈的补偿情况。通过现场实例测试证明,该测试仪具有操作较安全、简便易用、测量时间短、测量结果准确等优点。Firstly, the paper introduces some different schemes to measure capacitive current and discusses their merits and demerits. Then the applied method which measures and calculates the capacitive current of distribution network with single phase to earth via resistance is put forward, and the novel microcomputer-based, intelligent measurement system of capacitive current which can be used in the 6-10 kV distribution network is designed. Based on the symmetrical component principle, the measurement system can indirectly acquire the single phase to earth current of the tested distribution network by the measurement of the UR02 IRE and U02. Here UR02 stands for the secondary zero sequence voltage of the distribution network when it has single phase to earth fault via resistance. IRE stands for the current through the earth resistance. U02 stands for the secondary zero sequence voltage of the distribution network when it has single phase to earth fault directly. Meanwhile U02 is equal to the secondary phase-to- phase voltage of the distribution network which can be got from the voltage transformer of the distribution network. Furthermore, the absolute capacitive current of the whole distribution network Ic∑ and the whole insulated resistance current of the distribution network IR∑ can be calculated by testing the phase difference of the two vectors IRE and UR02. For those distribution network whose neutral points are earthed via arc-suppression coil, the compensation status of the coils is also known. Finally, by giving a measuring example, the author testifies that the discussed measurement system is easier to operation, more accurate, faster and safer than others.

关 键 词:配电网 电容电流 微机 测试仪 对称分量法 单相接地 

分 类 号:TM933.1[电气工程—电力电子与电力传动]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象