雪山工程—水力发电与跨流域调水综合工程  被引量:3

The Snowy Mountain Scheme-A Combined Hydro-electric Generation and Inter-Basin Transfer Scheme

在线阅读下载全文

作  者:Shaan Pawley 杨永辉[1] 杨艳敏[1] 樊彤[1] 

机构地区:[1]中国科学院遗传与发育生物学研究所农业资源中心,石家庄050021

出  处:《南水北调与水利科技》2007年第2期97-100,共4页South-to-North Water Transfers and Water Science & Technology

基  金:澳大利亚青年发展大使项目(AYADINTAKE15);中国科学院知识创新方向性项目(KZCX3-SW-446)

摘  要:雪山工程位于澳大利亚东南部的墨累达令流域,是一项在墨累河和马兰比吉河上进行水力发电、农业灌溉调水和河道管理的综合工程。从工程管理、规划、主要设施建设、调水量、水权、用水分配原则以及一些环境问题的角度介绍雪山工程的情况。The Snowy Mountain Scheme, located in southeast Australia, is a project which integrates hydro? electricity generation and the transfer of water for irrigation and river management in the Murray and Murrumbidgee river systems, which are both located in the Murray-Darling Basin. The purpose of this paper is to provide information about the Scheme, including its governance, the layout, engineering features, water releases, rights to water and water release rules and some of the environmental issues.

关 键 词:跨流域调水 澳大利亚 雪山工程 墨累达令流域 

分 类 号:TV68[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象