检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,武汉430072
出 处:《水力发电学报》2007年第2期1-4,共4页Journal of Hydroelectric Engineering
基 金:国家重点基础研究发展计划(973计划)项目(2003CB415200)
摘 要:黄河上游梯级水库水电站群承担发电、灌溉、防洪、防凌等任务,是目前国内综合利用要求最多的梯级水电站群。本文针对该系统的特殊要求,建立了含有水位、流量和出力等式约束的梯级优化调度模型,目标函数为兼顾保证出力要求的发电量最大,采用约束惩罚法将等式约束转化为目标函数的一部分,然后应用DP-DDDP组合算法求解。研究表明,这种方法可以有效地求解具有复杂、多变约束条件的长期联合优化调度模型。The cascade hydropower reservoirs which are located in the upstream of Yellow River, have been designed for many purposes, such as power generation, irrigation, flood control, ice prevention, and navigation etc. To solve the special demands of this system, this paper has put forward an optimal operation model with constraints of the water level, release and output. The objective function is to maximize the whole power generation of the system on the basis of achieving the guaranteed output and changing the constraints into a part of objective function by using penalty function method, then applying DP and DDDP for calculation. It is shown that this algorithm can effectively solve the long-term optimal joint operation model with complicated and various constraints.
关 键 词:水资源系统 水电站长期优化调度 动态规划 罚函数 综合利用水库
分 类 号:TV697.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31