检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,湖北武汉430072
出 处:《泥沙研究》2007年第1期76-80,F0003,共6页Journal of Sediment Research
基 金:国家"973"计划资助(2003CB415206);国家自然科学基金项目(50209012)
摘 要:襄樊电厂一、二期工程均以汉江为水源,采用直流供水方式,排水入汉江。本文建立了电厂取、排水口河段动床实体模型,考虑了在建的南水北调工程和拟建的崔家营航电工程对该河段的河床演变和水流泥沙运动影响,从三维空间角度详细研究了取、排水河段水流泥沙运动及河道冲淤演变趋势、取水口附近底沙运动情况、取水安全可靠性等问题,并提出了稳定取、排水口附近河岸及保证取水可靠的建议性措施。The first and second stage of Xiangfan power plant is designed to take water from Hanjiang River and drain the cooling water into the same River. The physical model for the intake and outlet reach has been built in this paper. At the same time, the influence of South-North Water Transfer Project and Cuijiaying hydroelectric project on the riverbed deformation and flow-sediment movement are investigated. Finally, some suggestions are given to stabilize bank near the intake and outlet reach and to assure the safe water taking.
分 类 号:TV67[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.66