检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《水利电力机械》2007年第4期28-33,共6页Water Conservancy & Electric Power Machinery
摘 要:针对1 000MW超超临界机组设计目标,从高效、可靠、节能、环保等4方面对1 000MW超超临界机组设计目标进行了探讨和研究。根据目前的设备设计及制造水平,在确定电厂燃用的煤种后,能够实现电厂热效率大于45%,在电厂设计的初可研、可研、初步设计阶段,经过对系统和设备的优化,能够实现1 000MW超超临界机组设备及主要系统安全可靠运行及机组的节能目标。The design goals for 1000 MW ultra- supercritical unit are discussed and researched in aspects of high efficiency, reliability,energy conservation and environmental protection. It is concluded that the thermal efficiency of power plant exceeding 45% can be achieved based on current design and manufacturing capabilities after the coal type is determined. Through optimization of system and equipment during preliminary feasibility study, feasibility study and preliminary design of power plant.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222