清河斜拉桥中塔柱模板施工方案设计  

Project Design of Molding Board of Cable Tower in Qinghe Cable-stayed Bridge

在线阅读下载全文

作  者:张延吉[1] 林连柱 

机构地区:[1]白城师范学院,白城137000 [2]北京市政总公司

出  处:《东北林业大学学报》2007年第4期78-80,共3页Journal of Northeast Forestry University

摘  要:对清河斜拉桥中塔柱施工模板的面板和肋进行了设计及强度、刚度计算,并通过对模板施工中模板系统安装、拆除工艺流程和中塔柱模板提升系统、锚固系统、支撑系统、横撑受力计算,以及中横梁施工、模板施工控制测量等多个方面的设计,确定了更为有效合理的清河斜拉桥中塔柱模板施工方案。该方案通过了实践的检验。A design of faeeplate and steel ribs of molding plate of cable tower in Qinghe cable-stayed bridge was made, and the intensity and rigidity were also calculated. A more reasonable project was obtained by means of various designs of the installation of molding board system, the baekout of technological flow, the lifting system for the molding board of the middle cable tower, anchorage system and holding system, the force calculation for transverse struts, the construction of mid-bunton, and the measurement of construction control of molding board in the course of molding board construction. This project is proved to be more reasonable by practice.

关 键 词:模板 强度 安装 测量 

分 类 号:U448.27[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象