流水网络计划方法在多层主体施工中的应用  

The application of flow-network plan in multistorey construction

在线阅读下载全文

作  者:王志全 连捷敏 

机构地区:[1]福建省第四建筑工程公司,361003

出  处:《福建建筑》1997年第1期32-34,共3页Fujian Architecture & Construction

摘  要:在组织多层不等步距异节拍专业流水施工时,必须采用平衡流速的方法,竖向流水才能连续进行。平衡流速通常有三种方法;一是将流水节拍大的专业施工过程增加专业工作分队,二是将流水节拍大的专业施工过程增加工作班次,若上述两种方法受客观条件限制不宜采用时,可采用第三种方法即:让部分流速快的穿插施工过程允许其流水作业间断,其实质上是使流速快的施工过程的速度减慢来平衡流速慢的主导施工过程的流水作业使竖向流水能够连续进行。本文着重分析了第三种方法在多层体施工中的应用。When organizing a mulistorey construction in a conveyer system, which differs in both distance and rhythmic,it is necessary to adopt the process in convevyer system. Usually three methods are applied: First, to increre the professsional working groups in low frequency process.Secondy,to increase the number of runs of work in low frequency process.If these two metbodscan't be properly atlopted, the third may be put into use, that is: to suspend the high frequency process, then it's speed can beslowed down and balance the speed of low frequency process,so that the vertital conveyer system will process continously.In thispaper, it is emphased that how to apply the third metha in multistorey construction.

关 键 词:流水网络计划 多层主体施工 应用 施工组织法 

分 类 号:TU721.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象