检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]天津大学
出 处:《中国给水排水》1997年第1期9-11,共3页China Water & Wastewater
摘 要:着重讨论了在给水泵站设计中,如何借助计算机确定选泵方案的有关问题。首先提出了工况点流量和可行泵的概念以及一种适合于计算机的选泵方法——工况点流量分析法;然后以给水二泵站为例,从目标函数和约束条件两方面讨论如何建立既反映实际情况又容易求解的数学模型;最后,根据工况点流量分析法,得出模型的解法及步骤。并在该研究的基础上,开发了给水泵站辅助设计系统(PDS1.0)。In this article,how to solve problems of optimatizing parallel pumps scheme for designing water ·Sponsored by the Department of Urban Construction of The Constrution Ministry ·Edited by the China Water & Wastewater Editorlal Board Editor in chief Zhongmin Yu ·Published by the North China Municipal Engineering Design institute Address Qixiang Tai Road.Hexi District.Tianjin Tel(022)3538974 3342167 Fax(022)3538974 3374502 ·Printed by Tianjin First Xinhua Printing House supply pumping station was studied on computer.Firstly,two concepts of operational point flowrate and of feasible pump and a method for computer aided water supply pumping station design operational point flowrate analysis method was put forward.Then,taking a secondary water supply pumping station as an example,how to establish a mathmatical model both representing actual situations and easy to solve was from two aspects of target function and constraint conditions.And finally,the solution to the above model and its procedures is worked out,based on the operational point flowrate analysis method. A computer aided design system(PDS1.0) of water supply pumping station was developed on the basis of the studies,it proved to be an effective and convenient tool for designers.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3