某大桥单桩承载力估算与静载试验结果对比分析  被引量:2

Comparative Analysis between the Result of Pile Vertical Ultimate Capacity Based on Formula and the Result of Static Load Test on a Certain Bridge

在线阅读下载全文

作  者:吴军[1] 马云玲[2] 

机构地区:[1]武汉理工大学土木工程与建筑学院,武汉430070 [2]洛阳工业高等专科学校建筑工程系,洛阳471003

出  处:《国外建材科技》2007年第2期79-81,85,共4页Science and Technology of Overseas Building Materials

摘  要:根据某在建大桥工程实例,通过对估算方法和静载试验法进行分析和对比,确定出该工程基桩的单桩竖向极限承载力;并对由这2种方法所确定的浦西主墩基础单桩竖向极限承载力未能较好拟合进行了简要分析,得出了估算值偏大的4点主要原因,为此类型桩基的承载力提供设计参考依据。According to the comparative analysis between the result based on empirical formula and the result of the static load test, the pile vertical ultimate capacity of a certain project is determined. When the results acquired from the two methods about the steel pipe pile of the base on the west side of the Huangpu river are not well consistent, the text gives four main reasons, and it gives some help to the design of the vertical ultimate capacity of the same style pile.

关 键 词:单桩竖向极限承载力 静载试验 对比分析 钢管桩 

分 类 号:U441.2[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象