检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海交通大学塑性成型工程系,上海200030 [2]上海交通大学模具CAD国家工程研究中心,上海200030
出 处:《锻压装备与制造技术》2007年第2期79-82,共4页China Metalforming Equipment & Manufacturing Technology
摘 要:为解决串行方式下模具生产的许多不足,提出基于并行工程和Multi-Agent技术的模具生产计划制定方法,实现了生产进度计划的动态性制定,给出Multi-Agent技术冲突的消解方法。该方法显著提高了模具设计制造效率。通过算例及结果分析,表明该方法是合理而可行的。An approach to the establishment of die & mould production schedule based on concurrent and Multi-agent technology has been proposed to solve the disadvantage of serial mould production which realizes the dynamic establishment of production schedule scheme and establishes the method to solve the conflict of Multi-agent technique.This production schedule establishment method improves the efficient of die & mould design and manufacture greatly on the basis of simulation and result analysis which indicates the rationality and feasibility.
分 类 号:TP391[自动化与计算机技术—计算机应用技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31