煤矿栈桥顶升纠倾设计  被引量:5

LIFTING AND RECTIFYING DESIGN OF COALMINE TRANSSHIPMENT GALLERY

在线阅读下载全文

作  者:赵来顺[1] 唐丽云[1] 邹仁华[1] 王芝银[1] 

机构地区:[1]西安科技大学建工学院,西安710054

出  处:《工业建筑》2007年第4期84-87,共4页Industrial Construction

基  金:陕西省教委专项科研基金项目(02JK129)

摘  要:首次应用数值模拟方法对煤矿栈桥发生较大量下沉、倾斜问题进行建筑病害分析,提出柱基下预压托换桩和斜撑架断柱相结合的综合顶升纠倾法治理方案。结合结构性能分析,给出顶升纠倾的转动轴位置、柱体断口位置、加载点布置、加载及位移控制量确定的设计要点,并用数值模拟方法予以验证,使后续施工达到预期目的。Based on analyzing the reason of the settlement and slope of transshipment gallery in coalmine, numerical simulation was firstly used in analyzing the damage of the building and comprehensive uplifting underpinned piles under column foundation and intercepting brace columns. With analyzing structural function, rotating axis, the intercepting position of column, loading point layout and the decision of load and displacement value were stated. Numerical simulation method was used to prove it. Expected targets were achieved in post construction and good effect of treating the specific structure was obtained.

关 键 词:煤矿栈桥 顶升纠倾 数值模拟 病害治理 

分 类 号:U448.18[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象