检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵来顺[1] 唐丽云[1] 邹仁华[1] 王芝银[1]
出 处:《工业建筑》2007年第4期84-87,共4页Industrial Construction
基 金:陕西省教委专项科研基金项目(02JK129)
摘 要:首次应用数值模拟方法对煤矿栈桥发生较大量下沉、倾斜问题进行建筑病害分析,提出柱基下预压托换桩和斜撑架断柱相结合的综合顶升纠倾法治理方案。结合结构性能分析,给出顶升纠倾的转动轴位置、柱体断口位置、加载点布置、加载及位移控制量确定的设计要点,并用数值模拟方法予以验证,使后续施工达到预期目的。Based on analyzing the reason of the settlement and slope of transshipment gallery in coalmine, numerical simulation was firstly used in analyzing the damage of the building and comprehensive uplifting underpinned piles under column foundation and intercepting brace columns. With analyzing structural function, rotating axis, the intercepting position of column, loading point layout and the decision of load and displacement value were stated. Numerical simulation method was used to prove it. Expected targets were achieved in post construction and good effect of treating the specific structure was obtained.
分 类 号:U448.18[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.226.181.89