总承包中的深化设计管理研究  被引量:14

Research on Shop Drawing Management in Lump-sum Construction Contracting

在线阅读下载全文

作  者:纪凡荣[1] 罗能钧[2] 佀同光[1] 

机构地区:[1]东南大学工程项目管理研究所,江苏南京210096 [2]山东建筑大学,山东济南250101

出  处:《建筑经济》2007年第5期49-51,共3页Construction Economy

摘  要:国内推行的建设项目总承包尚未与国际完全接轨,许多大型项目的设计都是由国外进行初步设计,由国内总承商深化设计后才能进行施工,这种设计模式存在一定的问题。本文从承包商角度论述了深化设计的管理内容、方法以及深化设计的项目管理体系,并针对工程总承包中存在的深化设计问题,提出了应对措施和建议。Lump-sum construction contracting in China has no complete access of the international construction project. Because preliminary design or concept design of some large-scale construction project is done commonly by foreign designers, and the shop drawing, directing construction building, is actualized by domestic designers, there exist some issues in this design model. From the.view of contractor, the paper discussed the contents, methods and system of the shop drawing project management. For solving the troubles exited, some advices and measures were given in the end.

关 键 词:工程总承包 深化设计 项目管理 

分 类 号:F407.9[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象