检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:程润虎[1]
机构地区:[1]水利部山西水利水电勘测设计研究院,山西太原030024
出 处:《水利水电技术》2007年第5期26-28,共3页Water Resources and Hydropower Engineering
摘 要:山西省万家寨引黄工程北干线输水管线大部分地段通过黄土地区,黄土地基的湿陷性已成为主要的工程地质问题。在湿陷性黄土地区进行工程建设,应查明黄土的工程特性,湿陷性质、厚度、成因及其分布变化,确定场地湿陷类型和地基湿陷等级,并按工程设计的特性需求,进行地基处理等研究是十分必要的。Most part of the North Trunk Line of Wanjiazhai Yellow River Delivery Project has to pass through the zone of collapsible loess, so the collapsibility of the loess foundation becomes the main engineering geological problem therein. Under this circumstance, it is necessary to find out the engineering characteristics, collapsible features and thickness, cause of the formation and the distribution of the loess, so as to determine the collapsible types of the site and the collapsible classification of the foundation and then to carry out the the foundation treatment in accordance with the requirement of the project design.
关 键 词:万家寨引黄工程 北干线 湿陷性黄土 特征研究 处理措施 地基处理
分 类 号:TV672.2[水利工程—水利水电工程] TU449[建筑科学—岩土工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.175