大花水水电站泄洪中孔预应力闸墩设计  

Design for Pre-stress Piers in Middle Discharging Orifices of Dahuashui Hydropower Station

在线阅读下载全文

作  者:李社凤 黄琼[1] 彭成佳[1] 

机构地区:[1]中国水电顾问集团贵阳勘测设计研究院,贵州贵阳550002

出  处:《贵州水力发电》2007年第2期22-26,共5页Guizhou Water Power

摘  要:大花水水电站泄洪中孔主要功能为参与泄洪,中孔出口设置弧形工作闸门,该闸门孔口尺寸为6 m×7 m(宽×高)、设计水头为63 m,单边弧门支铰推力较大。根据结构构件计算结果并综合有限元分析成果,中孔闸门闸墩设计采用了预应力锚索技术。本文重点介绍了大花水水电站泄洪中孔预应力闸墩的布置设计。Radial gates are installed in the middle discharging orifices of Dahuashui Hydropower Station. The size of a gate is 6m ×7m (width × length), its design head is 63m, the thrust on the hinged bearing of the gate is bigger. According to the results of calculations including finite element method, pre-stress anchorage cables were adopted in pier design for gate of meddle orifices. The paper mainly introduces layout design of the pre-stress piers.

关 键 词:水工结构 泄洪中孔 闸墩 预应力锚索 设计 大花水水电站 

分 类 号:TV662.2[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象