检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团贵阳勘测设计研究院,贵州贵阳550002
出 处:《贵州水力发电》2007年第2期71-73,共3页Guizhou Water Power
摘 要:大花水水电站双曲拱坝最大坝高134.5 m,是目前国内外已建最高的碾压混凝土双曲拱坝。为确保该拱坝混凝土施工质量,对碾压混凝土的原材料和配合比进行了试验研究。其研究成果表明,水泥、粉煤灰、砂石骨料、外加剂等原材料均满足规范要求,各种强度等级碾压混凝土配合比的水量适中、胶凝材料总量合适、力学性能满足设计要求,且抗渗与抗冻等级较高、耐久性良好。试验成果已成功应用于该工程中。The double-curve arch dam with dam height of 134. 5 m of Dahuashui Hydropower Station is one of the highest RCC arch dams in home and abroad. In order to ensure its construction quality, test research of mix proportion of RCC was done, and the results made known that all materials including cement, fly ash, aggregate, admixture and etc. meet the requirement of regulations, in various mix proportions water proportion and the total volume of cementing materials are suitable, the RCC meets the requirement of design, and its grade for impermeability and frost resistance is higher and its durability is also well. The test result has been applied in the engineering practice.
关 键 词:水工材料 碾压混凝土配合比 试验研究 大花水水电站
分 类 号:TV41[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117