检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海交通大学机械与动力工程学院,上海200030
出 处:《焊接学报》2007年第5期9-12,共4页Transactions of The China Welding Institution
基 金:教育部博士点基金资助项目(20050248028);国家自然科学基金资助项目(50575140)
摘 要:针对板管间接点焊过程中焊接变形较大,引起接头质量难以保证的问题。通过采集电极位移曲线,研究板管间接点焊过程中膨胀量和变形量的变化规律,分析不同焊接工艺参数(焊接电流、电极力和焊接时间)对该点焊过程的影响。结果表明,板管间接点焊焊接阶段,膨胀过程与变形过程相互耦合;保持阶段,在电极力作用下,焊接变形进一步加大,最大变形量随着电极力的增大和焊接热输入的增多而线性增加。发生喷溅时,电极位移曲线出现阶梯状畸变,可利用位移曲线斜率的变化评判该点焊的喷溅现象。研究结果为板管间接点焊过程在线监测与质量控制提供理论指导。In sheet-tube indirect spot welding,it is difficult to assure welding quality because the welding deformation is too large.The expansion and welding deformation were investigated and the influence of different welding parameters(welding current,electrode force and welding time)on indirect spot welding process was analyzed through electrode displacement.The experiment result shows that the course of the expansion and welding deformation are coupled to each other in the welding stage;in the holding stage,welding deformation gets larger under the ailion of applied electrode force.Maximum welding deformation of sheet-tube indirect spot welding process is almost linear with electrode force and input welding energy.Ladder-type occurs in the electrode displacement curve when the expulsion happens,so the expulsion can be judged according to the slope coefficient of electrode displacement.The result provides a theoretical guidance for on-line monitoning and control of welding quality in sheet-tube indirect spot welding process.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117