龙滩水电站尾水检修闸门抓梁与门叶配合调整及梁格封堵  

Match Adjustment and Beam-grid Blockage of Grasp Beam and Gate Leaf of Draft-tube Check Gate for Longtan Hydropower Station

在线阅读下载全文

作  者:唐扬文 刘德昆 

机构地区:[1]中国水利水电第十四工程局机电安装总公司,云南昆明650032

出  处:《水力发电》2007年第4期52-53,共2页Water Power

摘  要:龙滩水电站尾水管金属结构设备安装过程中,发现尾水洞出口检修闸门的自动抓梁与门体配合存在问题。同时,由于泥沙的淤积,造成门叶的重量大大的增加。针对这些问题,对抓梁定位座及梁格分别采取了修改尺寸和封堵的措施,取得了良好的效果。可供同行参考借鉴。In the installation of metal structure of tail pipe of Longtan hydropower station, we found that there is a problem in the match of automatic grasps beam with gate leaf in the outlet check gate of tail-water tunnel.Meanwhile,due to the sedimentation,the weight of gate leaf increased greatly.For this reason,the measures such as changing its size and blockage for the grasp beam and beam grid have been taken and a good effectiveness has been gained,which can be used for reference for the similar project.

关 键 词:自动抓梁 梁格封堵 龙滩水电站 

分 类 号:TV663[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象