龙滩水电站工程安全度汛保障体系  

The Security System for the Project Safety During Flood Season of Longtan Hydropower Station

在线阅读下载全文

作  者:程纲为 

机构地区:[1]龙滩水电开发有限公司,广西南宁530023

出  处:《水力发电》2007年第4期82-84,共3页Water Power

摘  要:龙滩水电站工程建设工期较长,自然灾害风险因素较多,工程安全度汛与施工进度、质量的矛盾较突出。通过采用建设工程防汛体系、水情自动测报、安全监测系统以及引入工程保险,形成安全度汛的全面保障体系,保证了工程施工的顺利进行;并在工期控制、施工质量和安全生产等方面取得显著成效,为实现首台机组提前发电奠定了坚实的基础。The construction of Longtan Hydropower Station covers a long period and the risk factors from the natural hazards are quite complex. As a result, the conflicts between the flood control and the progress of the project are quite outstanding, However, the security system for the flood control was built up by the establishment of flood control system suto hydrologicai forecasting system, safety monitoring system for the project and the introduction of project insurance system.The security system supports and assures the smooth construction of the project.In addition,it also gained great achievements in milestone control ,quality control and safe construction,which lays a solid foundation for the early power generation of the first unit.

关 键 词:防洪度汛 水文预报 安全监测 工程保险 保障系统 龙滩水电站 

分 类 号:TV697.13[水利工程—水利水电工程] TV698.1

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象