搭接网络计划的多资源模糊优化及问题的探讨  

Probe into Some Problems About Using Fuzzy Algorithm for Multiple Resource-constrained in Overlapping Network

在线阅读下载全文

作  者:曾祥惠[1] 侍克斌[1] 袁莹[1] 

机构地区:[1]新疆农业大学水利与土木工程学院,新疆乌鲁木齐830052

出  处:《水力发电》2007年第5期86-87,共2页Water Power

基  金:新疆水利水电工程重点学科基金资助项目(xjzdxk-2002-10-05);新疆高校科研计划重点资助项目(xjEDU2005Ⅰ09)

摘  要:针对工期固定情况下搭接网络中的多资源优化问题,运用模糊优选理论确定各种资源的重要性,进而对其进行同一化处理,最终解决搭接网络的多资源优化问题。同时,通过实例证明了该方法的实用性,并对存在的问题进行了研究和探讨,提出相应的解决方法。This article discussed the problems about using fuzzy optimum for multiple resource-constrained in overlapping network, to determine the roles of the difference resources by fuzzy algorithm theory, then we treatments resources by quasi'shared method, and we will final solution this question about multiple resource-constrained in overlapping network.Meanwhile,engineering calculation is used and the function of the method is verified .the existed problems was discussed and analyzed,it also finds out ways to the new problems.

关 键 词:撒拉网络 多资源 模糊优化 同一化 施工计划 

分 类 号:TV511[水利工程—水利水电工程] O221.6[理学—运筹学与控制论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象