检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马欣本[1]
机构地区:[1]中国石油大学(华东)石油工程学院
出 处:《油田化学》2007年第1期38-41,82,共5页Oilfield Chemistry
摘 要:闵桥火山岩油藏以缝、洞、孔为主要储集空间和油气运移通道,复杂的裂缝网络系统中孔、洞、缝相互连通,水沿裂缝突进、快速导致油井水淹,采出程度为5.8%,综合含水已达89.9%。讨论并计算了挤注堵剂时堵剂进入裂缝所需的启动压力和最大爬坡压力。考察了木钙、PAM-乌-间、水玻璃-氯化钙、钠土-HPAM、复合颗粒等5种常用堵剂的性能,认为单独使用时都不能满足该油藏堵水要求。讨论了堵水工艺,确定采用笼统挤注方式,全程控制挤注流量以保持注入压力恒定,堵剂用量合理化。报道了闵桥22断块唯一的生产井闵22井三次化学堵水实施情况及结果。该井油层温度66.7℃,生产井段包括钻井液漏失段。2003年7月注入黏土-HPAM堵剂液60 m3,未建立爬坡压力,增油减水效果差,有效期90天。2004年1月采用水玻璃-氯化钙堵剂堵漏,木钙堵剂封口,增油减水有效期达180天,以后发生边底水绕道突进。2005年12月采用油溶性好的复合颗粒堵剂堵水,增油减水有效期长达210天。三次堵水投入产出比1∶3.8。表5参11。In lava oil reservoir of Minqiao, Jiangsu, the fractures and fissures, caves and pores serve as main reservoir spaces and passagesof reservoir fluids as well, and, being connected each with other, makes up a complex fractured network. Owing to water plunging through the fractures and fissures, the production wells would fast flooded out and a composite water cut of 89.9% was observed while an oil recovery was 5.8% only. The minimum pressure needed for a water shutoff agent (WSOA) to squeeze into fractures and fissures and the maximum pressure raise in the course of squeezing WSOA are discussed and determined. 5 commonly used WSOAs, namely Ca-lignosulfonate (CaLS), PAM/urotropine/resorcin, water glass (WG)/CaCl2, Na-bentonite/HPAM, and combinational particulated resins (CPRs) were evaluated for performance properties and no single WSOA could meet the requirements for water control in the reservoir. As for technologic aspects, following measures were taken: WSOA injection without zonal isolation; precise control of pumping rate in whole injection course to keep injecting pressure steady; and rationalized WSOA volume injected. The operations and results of 3 chemical shutoff in the only production well, MQ22, at Minqiao block 22 reservoir were presented. The producing layers of the well was of 66.7℃ and included a section of lost drilling fluid circulation. July 2003, 60 m3 of clay-HPAM suspension was squeezed but no raise in injection pressure was observed, only a weak positive response appeared in oil productivity enhancement (OPE) and in water cut reduction (WCR) in 90 days. Jan 2004, WG/CaCl2 were applied for sealing the leaking zones and CaLS-as postpad for sealing the rear ends of WSOA; in result OPE and WCR were maintained in 180 days and after then the plunge of edge and bottom water roundabout occured. Dec 2005, a water control job was conducted with 2 particulated oil soluble resins in combination and led to OPE and WCR over 210 days. An imput to output ratio 1 : 3.8 was obtai
关 键 词:化学堵水 重复封堵 堵水工艺 堵水剂复合 火山岩油藏 裂缝性油藏 闵桥22井 江苏闵桥油田
分 类 号:TE358.3[石油与天然气工程—油气田开发工程] TE39
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222