松原龙华松花江特大桥主桥悬臂浇注中临时水准点的复测  

The Resuming Measurement of the Temporary Level Spot of the Main Bridge of the Song Yuang Long Hua Songhuajiang super-Large-scale Bridge Cantilever Casting

在线阅读下载全文

作  者:张国辉[1] 郭锐[2] 宫秀文[1] 韩国栋[1] 

机构地区:[1]吉林省公路重点工程建设管理办公室,长春130021 [2]东北林业大学,哈尔滨150040

出  处:《森林工程》2007年第3期65-66,共2页Forest Engineering

摘  要:阐述了松原龙华松花江特大桥半刚构连续箱梁施工中临时水准点的设置与复测。主桥箱梁在悬臂施工过程中,必须设置高程控制观测点和施工临时水准点,以此作为全桥高程控制的基准,控制悬臂浇注时梁块的标高,确保全桥合拢后各点标高值符合设计要求。实践证明,龙华松花江特大桥成桥后的线形和合拢精度均达到施工规范的要求。This paper elaborated on the resuming measurement of the temporary level spot of the construction altitude control of half rigid frame continuous box girder. In the construction, temporary level spot and the height control observation spot should be settled as the standard of the height control of whole bridge, It controlled the scale height of gauge block to make sure the scale height of each spot of the bridge after folded fit the design requirement. Practice results proved that the closure precision and the alignment of bridge after being folded reached the demands of the construction criterion.

关 键 词:半刚构 连续箱梁 临时水准点 悬臂施工 复测 

分 类 号:U445.466[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象