检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢丽丽[1] 冯辉[2] 刘立新[2] 于秋波[1] 胡丹丹[2]
机构地区:[1]郑州大学综合设计研究院,郑州450002 [2]郑州大学土木工程学院,郑州450002
出 处:《建筑科学》2007年第5期34-36,4,共4页Building Science
基 金:河南省交通厅资助项目(2005P338)
摘 要:通过试验量测先张法混凝土梁构件切断钢绞线的端部区域内混凝土压应变值,分析了预应力传递长度范围内混凝土压应变(应力)的变化规律,验证了现行《混凝土结构设计规范》GB50010-2002和《公路钢筋混凝土及预应力混凝土桥涵设计规范》JTG D62-2004规定的预应力传递长度计算方法,并证明了现行规范所建议的在预应力传递长度范围内的混凝土压应力分布能够适用于先张预应力筋构件。The compressive strains of concrete in the end area of pretensioned concrete beams are measured, the variation of compressive strains(stresses) of concrete in the transfer length scope is analyzed and the calculation methods of the transfer length in the codes are proved. In addition, the distributions of compressive strains of concrete in the transfer length, which are based on "Code for Design of Concrete Structures"(GB50010-2002) and "Design Specifications for Reinforced Concrete and Prestressed Concrete Bridge-Culverts"( JTG D62-2004), are applicable for Pretensioned Concrete Beams.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.4