检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《中国工程科学》2007年第5期17-21,共5页Strategic Study of CAE
基 金:"九七三"国家重点基础研究发展规划项目(2002CB412707);江苏省交通科学研究计划项目(04Y029)
摘 要:阐述了桩基础范围内的河床冲刷实时监测的必要性;介绍了水压力传感器监测系统的应用、技术难点和解决方案。通过潮位监测点的设置,有效解决了水位波动的修正问题,采用依托于基桩的单点定位埋设法实现了传感器可靠定位和传感器信号的可靠传输,苏通大桥的工程实践表明,该方法具有实时性、连续性、长期性和精度高的特点。根据实测结果分析了桩基础范围内河床局部冲刷的机理。The problem of groundsill eroding is general and important for deep-water foundation in tidal reach. Application, technical difficulty and its settlement scheme of hydraulic pressure sensors system are introduced based on expounding the essentiality of riverbed erosion for real-time monitoring within group piled foundation. Amendment of fluctuant water level is realized by setting a sensor to monitor the tide. The sensors are fixed on the side of the piles reliably and sensor signal is transmitted smoothly with single point setting method. This method shows the characteristics of real-time, continuity, long-term and high precision when applied to the Su-Tong Bridge Project. Based on the results of monitoring, the mechanism of local scour within group piled foundation is analyzed.
关 键 词:水压力传感器 感潮河段 群桩基础 局部冲刷 实时监测
分 类 号:P332.4[天文地球—水文科学] TP212.9[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249