填料塔在汽油加氢装置脱C_9塔的应用  被引量:3

ANALYSIS AND OPTIMIZATION OF RECTIFICATION PROCESS IN THE DECARBONIZATIONNINE TOWER OF PYROLYSIS GASOLINE HYDROGENATION UNIT

在线阅读下载全文

作  者:郝昭[1] 陈久岭[1] 马永利[2] 

机构地区:[1]天津大学,天津300072 [2]中国石油兰州石化公司,甘肃兰州730060

出  处:《石油化工设计》2007年第2期30-32,42,共4页Petrochemical Design

摘  要:为了解决裂解汽油加氢装置脱C_9塔分离效果差、C_B芳烃收率低的技术问题,在技术上采用了高效规整填料塔的方法。在开车过程为解决分离效果差、液泛问题,对填料塔的精馏过程中进行了工艺摸索,找出了适宜的回流比和塔釜温度。同时提出了优化操作的合理、可行性建议并在实际生产中得到应用。In order to solve the problems of bad separation effect and low C8 aromatics yield in decarburization-nine tower of pyrolysis gasoline hydrogenation unit,a high effi ciency structured packing tower is adopted.To solve the problems of bad separation effect and flooding during start -up,the rectification process of packing tower is studied, and suitable reflux ratio and tower boiler temperature are defined.At the same time,reasonable and feasible sugges- tions on operation optimization are put forward and applied in practical operation.

关 键 词:填料塔 雾沫挟带液泛 优化 

分 类 号:TE624[石油与天然气工程—油气加工工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象