重水堆核电站大修工期优化的阶段实施方案探讨  

Study on the Phased Approach of Outage Duration Optimization of PHWR NPP

在线阅读下载全文

作  者:姜福明[1] 

机构地区:[1]秦山第三核电有限公司,浙江 314300

出  处:《核电工程与技术》2007年第2期38-41,共4页Nuclear Power Engineering and Technology

摘  要:核电站大修工期的长短是影响电站运行业绩的重要因素。随着电力市场竞争的不断加剧,各个核电站的业主千方百计缩短核电站的大修工期,同时保证下一运行周期内电站的安全、稳定运行。本文针对秦山三期重水堆大修工期优化提出阶段实施方案,旨在缩短大修工期。Outage duration is of great significance in nuclear power plant operational performance. With increasingly fierce competition in the electricity market, various means have been adopted by NPP owners to optimize the outage duration and at to ensure the safe and reliable operation of NPP in the next operation cycle the same time. A phased approach on optimization of outage duration is discussed in this article, aiming to shorten outage duration.

关 键 词:重水堆核电站 大修工期优化 核安全 

分 类 号:TM623.92[电气工程—电力系统及自动化]

 