焦炭塔堵焦阀接管部位在各种载荷和不同补强条件下的应力计算  被引量:3

STRESS CALCULATION FOR CONNECTING PORTION OF PLUGGING COKE VALVE OF COKE DRUM UNDER CONDITIONS WITH VARIOUS LOADS AND DIFFERENT REINFORCEMENT

在线阅读下载全文

作  者:王庆华[1,2] 成建国[1,2] 李祖贻 徐平 高向东[1,2] 

机构地区:[1]南京化工大学 [2]金陵石化公司

出  处:《石油化工设备技术》1997年第1期1-5,共5页Petrochemical Equipment Technology

摘  要:对焦炭塔堵焦阀接管部位分别进行了在塔顶馏出管线所作用的管端推力(矩)以及塔体轴、径向温差和接管与塔体连接区域温差载荷下的应力计算。结果表明,管端推力(矩)对该部位的应力起着重要作用。并将新塔堵焦阀部位的整体接管补强与旧塔的补强圈补强进行了应力对比,证明新塔接管焊缝处应力数值减小。Calculations of pipe end thrust (moment)applied by tower top effluent pipe,the loads caused by temperature difference between axial and radial of tower shell,and between the connecting pipe and adjacent portion of tower shell are carried out. The calculating results indicate that the pipe end thrust(moment)play an importance role in the stress on that portion. By comparision with integral reinfocement stress value of plugging coke valve of new tower to the reinforcement pad stress value of old tower,the stress value at connecting pipe weld of new tower is reduced.

关 键 词:焦炭塔 堵焦阀接管 应力计算 炼油设备 

分 类 号:TE962.02[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象