武山铜矿下向胶结充填试验方案探讨  被引量:7

A Discussion to the test Plan of Underhand Cemented Back Fill Process of Wushan Copper Mine

在线阅读下载全文

作  者:段龙银[1] 彭小刚[2] 

机构地区:[1]江西铜业集团公司,江西贵溪335424 [2]江西铜业公司武山铜矿,江西瑞昌332204

出  处:《铜业工程》2007年第1期11-13,共3页Copper Engineering

摘  要:介绍了现用的水砂充填采矿法特点及存在的问题:铺底、水砂充填、坑木支护等工艺环节多;充填体强度低;采场压力大;安全管理困难;生产效率低。如改用下向胶结充填采矿法能解决此问题,并介绍了下向胶结充填采矿工艺流程及要注意的技术经济等方面的问题。The article introduces the feature and problem of the currently adopted sand back fill process and compares it to cemented back fill process. The sand back fill process is featured with complicated procedures (sill mat, sand back fill, timber support, etc. ), low strength, and high pressure in stope, low safety and efficiency. While the underhand cemented back fill process can solve all these problems. The article also introduces the process procedure of underhand cemented back fill process and the technical economy aspect to be noticed.

关 键 词:胶结充填 底梁 滤水墙 

分 类 号:TD853.343[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象