检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]焦作煤业(集团)有限责任公司,河南焦作454002 [2]河南理工大学,河南焦作454003
出 处:《煤炭技术》2007年第6期89-91,共3页Coal Technology
摘 要:赵固二矿风井筒穿过的冲积层厚度达到528.85 m,地质、水文地质条件复杂,冻结设计和施工难度较大。煤科总院北京建井所在总结赵固一矿、泉店矿冻结制冷设计、施工经验和教训的基础上,对赵固二矿的风井冻结制冷方案进行设计优化,达到了安全、合理、快速、经济的目的。The alluvium thickness of air shaft in Zhaogu No. 2 Coal Mine is up to 528.85 m. The geologic and hydrographic conditions are complex, so it is very difficult for freezing design and construction. Based on some design and construction experiences on Zhaogu No. 1 Coal Mine and Quandian Coal Mine, project design for air shaft freezing refrigeration of Zhaogu No. 2 Coal Mine is optimized by Beijing Construction Shaft Department of China Coal Science Research Institute. This design plan is safe, reasonable, quick and economical.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33