检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:范宏[1] 程浩忠[1] 张节潭[1] 金华征[1] 金义雄[1] 王一[1] 钟明明[1]
机构地区:[1]上海交通大学电子信息与电气工程学院,上海市200240
出 处:《电力系统自动化》2007年第11期35-38,73,共5页Automation of Electric Power Systems
基 金:上海市重点科技攻关项目(041612012);高等学校优秀青年教师教学科研奖励计划资助项目~~
摘 要:设计了考虑电力系统安全的输电网规划流程,改变了传统规划只考虑N安全和N-1安全的规划模式,进一步计算分析了规划网络在N-2安全情况下的缺电成本。文中采用故障筛选再规划的方式提高了N-1安全规划的计算速度,实现了大规模规划问题的求解,满足工程应用需要。18节点系统及实际电网147节点系统的计算结果表明,该方法行之有效。The process of transmission network planning considering the electric power system security is designed in this paper. It has renovated the traditional planning method in which only N secure rule and N-1 secure rule are considered, and the load shedding costs of the planning network in N-2 condition are further analyzed. The fault selection step is first carried out so that the computing of the N-1 security network planning can be speeded up and the large real network planning can be realized meeting the demand of engineering applications. Tests on the 18-bus system and a real power network of 147-bus system show that the method proposed is effective.
关 键 词:电力系统安全 输电网规划 启发式方法 N-1安全网络 N-2安全校验 缺电成本
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3