南水北调东线宝应泵站机电设备安装质量检测  被引量:10

Detection of installation quality of electromechanical equipments for Baoying pumping station in Eastern Route of South-to-North Water Transfer

在线阅读下载全文

作  者:汤正军[1] 

机构地区:[1]江苏省江都水利工程管理处,江苏江都225200

出  处:《排灌机械》2007年第3期27-30,共4页Drainage and Irrigation Machinery

基  金:国家自然科学基金资助项目(50179032);江苏省水利科技重点资助项目

摘  要:宝应泵站是南水北调东线第一个开工建设的项目,对以后其他泵站的建设起着示范的作用。简述了机电设备安装质量检测的重要性和必要性。针对宝应泵站,分析了机电安装质量检测的特点,指出了机电安装质量检测单位在检测前所需做的准备工作和检测过程中所需处理好的各种关系。较为详细地介绍了宝应泵站机电检测单位所做的具体工作;提出了改进泵站机电检测工作的设想,包括:检测单位必须具有相应的资质,检测工作范围应延伸至设备制造质量检测,改变检测工作的时间和方式等。Baoying Pump Station was the first-built project in South-to-North Water Transfer Project. It provides an example for the construction of other pump stations. The significance and necessity of the detection of installation quality of electromechanical equipments are presented simply. The characteristics of the detection and installation quality of electromechanical equipments are analyzed. The preparation work before the detection in the detection for the detecting institution, is pointed out. The specific work of the detecting institution of Baoying Pump Station is explained. It provides advisable experience and direction to detect the installation quality of electromechanical equipment of the pump station for the future.

关 键 词:南水北调 宝应泵站 机电设备 安装 质量检测 

分 类 号:TK730.6[交通运输工程—轮机工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象